Skip to content
Close view along a weatherboard wall stripped back to bare timber, with a sheet of corrugated iron propped over a window opening and ladders set up further along the wall.

Exterior House Painting in Bendigo

Exterior house painting across Greater Bendigo, including the repair work that has to happen before any of it goes on.

  • Over 30 years' experience
  • Weatherboards repaired and replaced before painting
  • Older homes, new homes and extensions
  • Obligation-free quotes

Outside, paint has two jobs at once. It sets how the house looks from the street, and it is the layer keeping the weather off everything underneath. The second job is the one that fails first, and it usually fails out of sight.

So a repaint here starts with what is under the old coat rather than with what is going over it. Where a surface has gone, it gets dealt with before anything is painted.

Exterior work is one half of what we do as house painters in Bendigo; the inside of the house is the other.

Before any paint

Weatherboard repairs and replacement before painting

Weatherboards take the worst of the weather on any house. Sun on one elevation, driving rain on another, and on an older place a century of both.

Boards give way at the bottom edge and at the ends first, which is exactly where nobody is looking. Paint needs something sound to grip, and a failed board is not sound: it keeps moving, keeps taking up water and keeps breaking down underneath whatever is put on top of it.

The new paint then lifts along that one board while the rest of the wall still looks perfectly good, which is the giveaway that the surface was the problem all along. The job looked finished and lasted a season or two.

That is why repairing an exterior and replacing weatherboards where they need it comes first on our jobs, rather than being work you have to organise separately. Which boards can be saved and which have to come out is part of working out the job, and a replacement is made good so the wall reads as one surface again instead of as a patch.

Corner of a weatherboard cottage showing freshly painted white boards next to a section of old cream paint that is cracked and flaking, with scaffold planks in front.
Fresh boards against the old cream coat next to them, which was already coming away.

A board that has gone soft or split will not hold a coating.

Better known early than halfway through

A wall we know needs work is a scheduling question and nothing worse. The same wall found once the scaffolding is up is a far less comfortable conversation. The more that is understood about the state of the boards up front, the closer the quote lands to the job you actually get.

Not every house needs it

Not every older house needs board work, and the ones that do rarely need it everywhere. One elevation can be entirely sound while the side that faces the weather has had enough.

Case study

Older homes brought back to life

The photographs here are from an 1800s weatherboard home we repainted. The old cream coat came back to bare timber along the walls, the repairs went in, and the house went back on in white with its brick chimney left as it was.

An older house is where preparation stops being a talking point and becomes most of the work. There was no version of this job that started with opening a tin.

Optional: if you want this shown, I need you to confirm which suburb or town this job was in.Optional: if you want this shown, I need you to confirm two or three sentences about this job, in your own words.

A painter standing on a trestle plank sanding a weatherboard wall that is part way through being painted white, with a red brick chimney and a split-system unit below.
Sanding a wall that is part way through going back on in white, with the old brick chimney beside it.
Front of a single-storey weatherboard and rendered-block cottage in faded cream paint, with scaffolding along the wall and a taped sheet of builder's wrap covering a patched section beside the downpipe.Before1 / 6

Front of a single-storey weatherboard and rendered-block cottage in faded cream paint, with scaffolding along the wall and a taped sheet of builder's wrap covering a patched section beside the downpipe.

The 1800s weatherboard cottage, start to finish — drag the slider, or use the arrow keys, to walk the job through.
Side wall of a weatherboard cottage with the old paint stripped back to bare timber, aluminium ladders and trestles leaning against the wall and a painter in white overalls working near the red brick chimney.
The old paint stripped back along the side wall, with the chimney left as it is.

New work outside

New homes and extensions

New exterior work starts somewhere else entirely.

The cladding has never been coated, the frames and trim are all clean edges, and the finish has to sit with whatever has already been chosen for the rest of the build.

The extension below went from unpainted sheet cladding, through undercoat with the black cut in around the windows, to a finished charcoal wall under a steel roof. It joins onto an existing cream brick house, and that junction is the part that has to look deliberate rather than tacked on.

We paint brand new homes, renovations and extensions outside as well as in, so a house being added to does not need two sets of painters to end up matching.

Gable end of a new extension with unpainted pale cladding sheets and large black-framed corner windows, joined to an existing cream brick house with a blue roof.
Sheet cladding up and unpainted, joined onto the existing brick house.
New extension with vertical corrugated cladding in white undercoat, black paint cut in around the window and door frames, a step ladder in front and a worker in a hi-vis shirt at the far end.
Undercoat on, with the black cut in around the window and door frames.
Gable end of a new extension finished in charcoal, with large black-framed corner windows, standing beside an existing cream brick house.
The finished charcoal, with the corner windows framed against it.

Exterior preparation

Prepared properly, every time

Exterior surfaces arrive with a history. Preparation outside is largely the work of undoing that before adding anything to it.

What the wall arrives with

Sun has chalked one wall, water has been working in under a sill on another, and somewhere on most houses there is a patch that was coated over rather than repaired.

Fixed, primed, prepared

Nothing outside gets painted until it has been fixed, primed and prepared. On an older home that accounts for most of the days on site; on a new one it goes faster, but it is not the step that gets dropped to make up time.

The weather gets a say

A prepared wall still has to be dry and the weather still has to hold, so exterior work follows the forecast rather than the diary. Losing a day to rain is cheaper than painting the same wall twice.

Common questions

Exterior painting questions

Not covered here?

Ring us and ask. It is the quickest way to get a straight answer about your own place.

0497 560 949

Can you repair or replace damaged weatherboards before painting?

Yes. Repairing an exterior and replacing weatherboards where they need it, before any paint goes on, is a normal part of what we do — not an extra we send you elsewhere for.

It matters because paint only lasts as long as the surface underneath it. Coating a board that has already gone is a short-term result at best.

Exterior painting in Bendigo

Do you paint older and heritage homes?

Yes. One of the projects we are proudest of is an 1800s weatherboard house brought back to life — repaired, prepared and repainted rather than simply coated over.

Older homes usually need more preparation than new ones, and that is where the difference between a finish that lasts and one that does not is decided.

See the weatherboard restoration

What's the best time of year for exterior painting?

Dry, mild conditions suit exterior painting best. Paint needs a dry surface to go onto and reasonable conditions to cure in, so heavy rain, heavy dew and extremes of heat or cold all work against a good finish.

In practice that means we schedule exterior work around the weather rather than around the calendar. If conditions are not right on the day, waiting is the cheaper option.

Why does preparation matter so much?

Because paint is only as durable as the surface beneath it. A coating applied over a surface that is damaged, loose or dirty will fail from underneath, however good the paint is and however neatly it goes on.

We make sure everything is fixed, primed and well prepared on every surface before the painting starts. It is the least visible part of the job on the day it is finished, and the part you notice most in five years.

Related

Related services

Interior painting

The inside of the house: walls, ceilings, doors and trim, in homes being lived in and in new builds.

Interior painting in Bendigo

Painting, start to finish

An overview of everything we paint, inside and out, and how a job runs from quote to completion.

All our painting services

Get an obligation-free quote

Tell us about the house — the boards, the trim, how long since it was last painted — and what you would like done with it.

Where we work
Located in Bendigo, servicing the Greater Bendigo region, Maryborough, Castlemaine and surrounding areas.

A photo or two of the job helps us quote it properly.

We'll only use your details to respond to your enquiry. See our Privacy Policy.

Thinking about the outside of the house?

Give us a ring, or send through what the outside of the house needs and we will get straight back to you.

Talk to us

0497 560 949

Located in Bendigo, servicing the Greater Bendigo region, Maryborough, Castlemaine and surrounding areas. Give us a call to see if we can come to you.

Call usGet a quote
Call Advanced Property Maintenance on 0497 560 949